HomeFinance & AdministrationFacilities ManagementAbout Us About Us Departments Our department is composed of the following areas: Administrative TeamAutomotive & Transportation ServicesBuilding TradesEnvironmental ServicesLandscaping & GroundsSustainabilityUtilities Maintenance See the full Facilities Management Organizational Chart Facilities Management Facts and Figures Population - Fall 2024Students – 7207 Faculty/Staff – 1725 Facilities Management Personnel Administration – 3.5Engineering Staff Engineer – 1 Control Technician – 1 Building Automation Applications Engineer – 1 Maintenance Engineer – 1 Utilities Clerk – 1 Building Trades Director – 1 Manager – 1 Supervisor – 2 Carpenters – 6.5 Roof Technician – 1 Locksmiths – 2 Lead Painter – 1 Painters – 2 Lead Moving & Setups Workers – 2 Moving & Setups Workers – 9 Law School Maintenance Mechanic – 1 Automotive Manager – 1 Supervisors – 2 Automotive Technicians – 3 Drivers – 16 (shuttle, tram, e-ride) Utilities Director – 1 Supervisors – 2 HVACR – 8 Plumbing – 8 Electrical – 6 Landscaping & Grounds Director – 1 Managers – 2 Supervisors – 2 Bot Garden Coordinator – 1 Gold Maintenance Coordinator – 1 Gardeners – 6 Horticulturalist – 4 Groundskeepers – 13 Arborist – 2 Irrigation Tec – 1 Mason – 1 Temporary Workers (Varies) Landscaping – 3 Environmental Services Director – 1 Assistant Director – 1 Managers – 3 Supervisors – 4 Bld. Serv. Tech – 2 Custodians FT – 93 Custodians PT – 21 Floor Crew – 17 Sanitation – 6 Warehouse – 3 FT, 3 PT FacilitiesApproximately 240 buildings totaling approximately 3.38 MSF Land690 acres total; approximately 317 acres maintained landscape Equipment Utility vehicles (Cushmans, electrics, gators, golf carts) – 135 Automotive Vehicles – 166 (includes Admission, Athletics, Maintenance, and Student Activities, Security) Equipment – approximately 110 (tractors, mowers, forklift, blowers, weed eaters, etc.) Alternative Fuel Vehicles – 42 (Biodiesel – 28; Hybrid – 2; Electric – 10; Propane – 2) This is 25% of the fleet. Work OrdersAnnual service requests – over 28,627 from 1 June thru 31 May. This includes preventative maintenance request. Building equipment maintained includes: Boilers – 108 Sewage Lift Stations – 8 CW/HW Pumps – 326 AHU & FC Units – 493+ A/C equipment – 48 (6 Tons or greater in size), 569 (5 Tons or less in size) Generators – 22 stationary Geothermal – 1 Solar Thermal – 84 panels Fire Alarm Systems – 151 Pools/Fountains – 6 Variable Refrigerant – 10 Solar PhotoVoltaic – 9925 Panels, 3MgWatt